Whippet have introduced – at extremely short notice – various changes to their X2 and X3 services (Huntingdon-Papworth Everard-Cambourne-Cambridge), most notably a reduced off-peak service. It’s not that long since the service was upgraded to run every half hour (Monday to Saturday), but it’s now back at the original hourly frequency. Sunday services are retained, though.
More information, and links to the revised timetable, are available from the Whippet website.
These changes have a knock-on effect on Whippet’s X3 service from Huntingdon to Thrapston and Corby. For further details follow the above link.
Roadworks at Papworth are affecting Whippet’s operations in that area. This is likely to continue until February 2022.