Whippet X2/X3 changes from 25th April

The road closures around Papworth Everard have come to an end so Whippet is introducing a revised timetable on routes X2 and X3 (Huntingdon-Papworth Everard-Cambourne-Cambridge) with effect from Monday 25th April. Further afield, this also means changes to the X3 between Huntingdon and Corby.

Further information and timetables are available on the Whippet website.

Note, though, that the reduced frequency introduced when the road closure began, back in November, remains in place.

Leave a comment